Guide · Websites

How to compare
quotes for a website.

Two quotes for a website almost never cover the same work. One includes the copy, the hosting and the business email, the other only the building of the pages — and both are called “building a website”. Which is why comparing on price says nothing until you reduce both quotes to the same list of items.

Category: Websites · 9 min read · For small business owners · Updated 29 July 2026

Below is that list: 24 items that should be clear before you sign, a table you can fill in while you read the quotes, and questions that put two quotes on the same footing even when they are written entirely differently.

01Who this guide is for

For you, with two or three quotes on the desk, the difference is twofold or threefold, and nobody has said anything that sounds untrue. That is the usual situation, and it is most often not a sign that somebody is overcharging — but that the quotes describe different scopes of work.

What you get: the list of items quotes are compared on, a table to fill in, the four costs that most often surface after signing, and nine questions that put quotes on the same footing.

02Why quotes cannot be compared on price

The price is the one number in a quote everybody understands, so it draws all the attention. But a price is a total — and the terms that make it up differ. In our experience three differences explain most of the gap between quotes:

  • Who writes the copy. A quote in which the client sends finished copy and a quote in which the contractor writes the content for eight pages are not the same job, even though the technical delivery is identical.
  • A template or a bespoke design. A bought theme filled with your content and a look built for your business differ in hours, not in the quality of the ambition.
  • What comes after launch. Some quotes include hosting, the domain, backups and changes for the first year; others end on launch day. Both are legitimate. But one carries costs the other leaves with you.
The first step is not negotiating the price. The first step is copying both quotes into the same table.

03A comparison table — 24 items

Fill it in while you read the quotes. Where an item is not mentioned, write “not stated” — that is the most important field in the whole table, because as a rule what is not written into a quote is not included in the price.

ItemItem
Quote AQuote A
Quote BQuote B
The scope of the site
ItemHow many pages, and which ones
Quote AQuote A …
Quote BQuote B …
ItemA bespoke design or a ready-made template
Quote AQuote A …
Quote BQuote B …
ItemWho writes and edits the copy
Quote AQuote A …
Quote BQuote B …
ItemPhotographs: who provides them and who holds the usage rights
Quote AQuote A …
Quote BQuote B …
ItemThe mobile version
Quote AQuote A …
Quote BQuote B …
ItemLanguages, and who translates
Quote AQuote A …
Quote BQuote B …
The technical delivery
ItemBasic technical SEO (titles, descriptions, structure)
Quote AQuote A …
Quote BQuote B …
ItemA speed and technical check before launch
Quote AQuote A …
Quote BQuote B …
ItemThe enquiry form, and where the messages land
Quote AQuote A …
Quote BQuote B …
ItemAnalytics, and who has access
Quote AQuote A …
Quote BQuote B …
ItemGoogle Search Console
Quote AQuote A …
Quote BQuote B …
Infrastructure and costs
ItemThe domain: who registers it, in whose name, who pays the renewal
Quote AQuote A …
Quote BQuote B …
ItemHosting: included or not, and for what period
Quote AQuote A …
Quote BQuote B …
ItemBusiness email: included or not, and how many accounts
Quote AQuote A …
Quote BQuote B …
ItemThe SSL certificate
Quote AQuote A …
Quote BQuote B …
ItemBackups: whether they exist, how often, who keeps them
Quote AQuote A …
Quote BQuote B …
ItemThe annual costs after the first year
Quote AQuote A …
Quote BQuote B …
Working together, and ownership
ItemHow many rounds of revisions are included
Quote AQuote A …
Quote BQuote B …
ItemMaintenance after launch, and at what price
Quote AQuote A …
Quote BQuote B …
ItemWho owns the code and the content
Quote AQuote A …
Quote BQuote B …
ItemWho gets the credentials, and when
Quote AQuote A …
Quote BQuote B …
ItemThe delivery deadline, and from what moment it runs
Quote AQuote A …
Quote BQuote B …
ItemWhat happens to the site if the relationship ends
Quote AQuote A …
Quote BQuote B …
ItemWhat is explicitly not included
Quote AQuote A …
Quote BQuote B …
The table is original BIRO 404 material, put together from the items that most often turn out to be contentious in conversations with clients who arrive with quotes already in hand. It is not a legal document and it does not replace a contract.

04The four costs that most often surface after signing

These are not scams. They are items taken as read on one side and not on the other — and that is why they never make it into the quote:

01

Renewing the domain and the hosting

The first year is often included in the build price. The second is not, and the invoice comes from somebody else.

02

The copy

“You send us the content” sounds like a detail until you sit down to write eight pages. If you are not planning to do it yourself, it should be an item in the quote.

03

Photographs

If the site needs photographs you do not have, somebody has to shoot or buy them. With bought photographs, also check what uses the licence covers.

04

Changes after launch

Adding a service, changing the price list, a new gallery — after launch all of that is either in a maintenance package or billed by the hour. That hourly rate is worth knowing in advance.

05Nine questions that put quotes on the same footing

Send the same questions to every contractor, on the same day, in writing. The differences in the answers will tell you more than the difference in price:

Nine questions — copy and send
  • How many pages are in the price, and what happens if one more is needed?
  • Who writes the copy — and if I write it, in what format and by when?
  • Are the domain, the hosting and the business email included, and for what period?
  • What do the costs come to in the second year, all in?
  • How many rounds of revisions are included before launch?
  • In whose name is the domain registered, and who is listed as the owner?
  • Which accounts and credentials do I get, and at what point?
  • What stays with me if I move to another contractor after a year?
  • What is explicitly not included in this price?

06Common mistakes when comparing

  • Comparing the total price without the scope. The commonest and the most expensive. The table above solves it.
  • Comparing the first year only. A quote that includes hosting and email in the first year looks dearer, and enters the third year cheaper.
  • Accepting a verbal agreement on scope. Three months later both sides sincerely remember it differently.
  • Skipping the question of ownership. The most unpleasant one, and it only comes out when you change contractor — which is why we gave it a guide of its own.
  • Dismissing the cheaper quote without reading it. If it covers what you actually need, the lower price is the right choice.

07How we write a quote

So that we do not ask of others what we do not do ourselves: our prices and the contents of the packages are public on the pricing page, and the whole flow of the work, from brief to launch, is set out on the web design page. What goes into maintenance after launch is separated out in the guide on maintenance. If you want to know what the ranges on the market look like before you even ask for quotes, there is an overview of website prices in Serbia, with the sample and its limits described.

08Common questions

Is the cheapest quote always a bad one?

No. A cheaper quote is often cheaper because it covers less work — one page instead of five, a template instead of a bespoke design, your copy instead of written copy. If that scope is enough for you, the lower price is the right choice. The problem starts when two quotes are compared on price but differ in scope.

What if the quote does not say who owns the website and the domain?

Ask in writing and insist on an answer in writing. The domain, the hosting, the code and the accounts can have different owners, and that depends on the agreement, not on a default rule. Who owns what is separated out in detail in the guide on ownership and access.

Should I ask for the quote in writing?

Yes. Not as a formality, but because a verbal agreement on scope is not remembered the same way by both sides. A written quote with a list of items is the only way to check three months later what was promised.

What if the contractor will not break the price down by item?

That is not necessarily a bad sign — many studios work to a package price, ourselves included. But a list of what the package contains has to exist. If there is neither a list nor a breakdown, you have nothing to compare.

Does BIRO 404 review other people’s quotes?

We can tell you which items are missing from a quote and what else you ought to ask. That is not a legal or a financial review, and we do not judge whether somebody else’s price is fair.

Last updated: 29 July 2026
A second pair of eyes

Got quotes and not sure what is missing from them?

Send them to us — we will look at which items are not mentioned and what is worth asking before you sign. We do not judge other people’s prices and we do not give legal opinions.